COVID-19: If We Do Nothing
This post is written on Sunday, March 22, 2020. The COVID-19 pandemic is ravaging the world. There are some most informative articles out there. This is one of the best…
This post is written on Sunday, March 22, 2020. The COVID-19 pandemic is ravaging the world. There are some most informative articles out there. This is one of the best…
Online calculator for anchor chain catenary analysis
Check Windfinder data for this oil port in Argentina. Two SPMs are operated by Oiltanking. A new CALM buoy is under evaluation. Wind forecast for undefined provided by windfinder.com
This video illustrates a success story. The loading out the 3,000 tonne caisson (that had been slipformed on land) is shown onto a semi-submersible barge.
Hydrostatic stability issues associated with float out and installation are addressed. Free surface effects within the multi-compartment structure are shown to be a significant limitation on the construction operations. A closed-form solution is presented to motions of the floating caisson in waves and swell, in shallow water during installation, implemented in Excel. This enables better planning of weather windows for construction and installation activities.
How to avoid crane boom backwards collapse caused by crane boom recoil from sudden loss of load